Cetinkaya, F. C., & Duman, M. (2021). Scheduling with lot streaming in a two-machine re-entrant flow shop. Operational Research in Engineering Sciences: Theory and Applications, 4(3), 142–175. https://doi.org/10.31181/oresta111221142c