Designing a framework for Subcontractor’s selection in construction projects using MCDM model
Ravande Kishore,
Department of Civil Engineering, UCE, Osmania University, Telangana State, IndiaSeyed Ali Mousavi Dehmourdi,
Department of Civil Engineering, UCE, Osmania University, Telangana State, IndiaM. Gopal Naik,
Department of Civil Engineering, UCE, Osmania University, Telangana State, IndiaMalek Hassanpour,
Department of Environmental science, UCS, Osmania University, Telangana State, IndiaAbstract
The difficulties discovered in selecting subcontractors via a simple method of bid price as the main factor along with an initial screening of subcontractor properties impressed us to look at a little beyond the existing trend and offer a coherent procedure for this purpose. Despite this, we know that the main factor in outsourcing a project is a bid price and this is in full agreement with the existing circumstances of subcontractor selection in Iran, but the objective of this research was integrating all criteria with the same importance for selecting a subcontractor. The questionnaire was used for collecting initial data of research to pass through the Analytic Hierarchy Process (AHP) and Multi-Criteria Decision-Making (MCDM) model of Simple Additive Weighting (SAW). The findings showed the priority in subcontractors' selection as Hejrat Manesh Izeh (1), Khesht Sazan Karoun (2), Yeganeh saze omid (3), Sakht karan Moongasht (4), Darya Sanat Khavarmianeh (5), Omran mehragane Yosef (6) respectively. The present study offered a coherent procedure to select the subcontractor regardless of the bid price importance and integrating all interfering criteria in the same importance.